Projects
Modesto WWTP Phase 2 BNR/Tertiary Wastewater Treatment Project General Contractor: GSE Construction – Carollo Engineering Design Scope: Installation and Welding of Ameron T-Lock (~12000 sqft)
SARI Mainline Relocation, Yorba Linda Ca. General Contractor: RASIC Construction. Welding and Application of Ameron protective lining – Manholes and Structures
Terminal Island WWTP, San Pedro Ca. General Contractor: Colich & Sons. Scope: Rehabilitate concrete and install Ameron Arrow Lock
SROG SAI & MANHOLE REHABILITATION PHX AZ. General Contractor: B&F Contracting – Dibble Engineering Scope: Pipeline joint and manhole rehab
Manhole Rehabilitation, Colton, Ca. Agency: Santa Ana Watershed Project Authority (SAWPA) Scope: Rehabilitation of existing manholes
Joint Outfall Unit D, Los Angeles Ca. General Contractor: Mladen Buntich Construction Company, Inc. Scope: Rehabilitation of pipeline and repair of Linabond
San Leandro WWTP, San Leandro, Ca. General Contractor: Amoroso Construction – Carollo Engineering Design Scope: T-Lock welding structures and manholes
Joint Outfall “C” Relief Trunk Sewer Phase 1, Los Angeles Ca. General Contractor: W.A. Rasic Construction Scope: Installation and Welding of PVC Lining at Junction Structures and approximately 6,000 lineal feet of 90” PVC lined RCP